Projects - Emergency Response Generators
Emergency Response Generators Hire and Maintenance
Western Power Scope of Supply: Design, build and commission a fleet of 20 separate packaged generator sets comprising of 12 x 500kVA, 4 x 300kVA, 3 x 100kVA trailered and 1 x 45kVA
Contract Design Brief
On all major design criteria, New Generation Power Systems met or in most cases exceeded the standard required. We are participating in supporting assets during high peak demand during summer periods. Our equipment complies with all requirements for connection to the Perth power grid.
- High level of competent, reliable field service and technical support
- Low noise level (70DBA @ 7 metres for 300kVA and 500kVA, 65DBA @ 7 metres for 100kVA and 45kVA
- Minimum tier 2 exhaust emission standard
- Light weight and portability
- fully self-contained to prevent fluid leaks into the environment
- Solar powered battery charging system
- Remote control and monitoring system
- Alarm and fault report call out system
- Ease of connection to external bulk fuel tank
- Auto-fill through on board fuel transfer pump, low and high alarms and anti-siphon and overfill protection
- Double Bunding of generator skid bases
- Stowage for auxiliary equipment and power cables for greater ease of deployment